FEATURED PROJECT

Irish Cement Drogheda, Co. Louth

Award-Winning ESP Inlet Wall Filter System for Irish Cement
Client
Irish Cement
Location
Drogheda, Co. Louth
Year
2025
Status
Completed
Sector
industrial
PROJECT OVERVIEW

THE WORK BEHIND THE PROJECT.

A clear overview of the project scope, delivery approach and final outcome.

PROJECT
Project Overview

A high-performance industrial system delivered with precision

This project involved the replacement of an ageing Electrostatic Precipitator inlet wall filter system, a critical component for emissions control, environmental compliance and long-term plant performance.

Project Focus
ESP inlet wall filter replacement
Tusker Delivery
In-house design, fabrication, transport and installation
Client Value
Improved efficiency, reliability and maintainability

Tusker delivered a complete end-to-end solution for a complex industrial environment, replacing an inefficient system with a bespoke modular inlet wall designed around site constraints, operational requirements and long-term durability.

The system was fabricated off site and transported to the facility as abnormal loads before being assembled and installed during a coordinated shutdown window. This approach helped reduce installation risk, minimise crane time and support a smoother programme on site.

Scope of works

  • Bespoke ESP inlet wall filter system design
  • Off-site fabrication of modular steel components
  • Specialist insulation and custom aluminium cladding works
  • Abnormal load transport to site
  • Crane lifting and installation using in-house designed lifting beams
  • Replacement of drag chains, bearings and associated mechanical servicing

Project outcome

  • Delivered a high-performance replacement for a critical emissions control system
  • Improved particulate capture, reliability and long-term maintainability
  • Reduced plant downtime through coordinated shutdown works
  • Completed safely, on time and within budget
  • Recognised with an Irish Steel Award in 2025
Important: Every Tusker project is planned individually, taking into account site conditions, programme requirements, safety planning, access, lifting requirements and the client’s commercial objectives.
TUSKER
LET’S BUILD SOMETHING GREAT

Have a similar project in mind?

Talk to the Tusker team about your next construction, steelworks, crane hire or specialist installation project across Ireland.

Ready to discuss the next step?
Contact Tusker View Our Services